in

Planning a clinic or small hospital: what to get right in the design

Healthcare buildings live or die by their planning. These are the decisions we settle early when designing clinics and small hospitals.

A clinic or small hospital is one of the most demanding building types for its size. Patients, staff, equipment, clean supplies and waste all move through the same building, and every mistake in planning becomes a daily inconvenience — or a risk.

Separate the flows

Plan how patients, staff, visitors, clean supplies and waste move through the building before drawing rooms. Keeping these routes apart, especially for operation theatres, sterilisation and waste, matters more than any finish.

Size the services early

Hospitals need far more from their building services than homes or offices: higher electrical loads, backup power, medical gas pipelines, dedicated air-conditioning for theatres and procedure rooms, and fire-fighting systems. These affect the structure, the ceiling heights and the shafts, so MEP design has to start with the architecture.

Plan for equipment

Diagnostic and treatment equipment can bring heavy loads, shielding requirements and specific room sizes. Get the equipment list and the suppliers’ room requirements before the structure is designed.

Design for cleaning

Seamless floors, coved skirting, washable wall finishes and accessible ceilings make a building easier to keep clean and cheaper to maintain.

Leave room to grow

Most practices grow. Plan the structure for additional floors, leave space for future lifts and shafts, and keep the services expandable.

Check the approvals

Healthcare buildings usually need fire safety clearances and may need other approvals depending on their size and services. Build the requirements into the design from the start.

Planning a healthcare project? Talk to our team about the design.

Share


WhatsApp